To accommodate more business, two new custom loading dock positions were designed with 8’ and 10’ openings to move standard and extra wide equipment.
THEIR CHALLENGE
Meeting growing demand at their Toronto location, Griffith Industries was challenged with the need for space at their current location. This demand required more loading docks, trailer restraints, newly constructed openings with overhead doors.
OUR SOLUTION
Optimize existing space to construct 2 new door openings from start to finish with full loading dock pits to meet growing distribution demand. With accommodating more business, two new doors were constructed with 8’ and 10’ openings to move standard and extra wide equipment.