Year-round improvements are made possible by lowering energy bills and improving working conditions for employees.
Company: Toro Aluminum
Province: Ontario
THEIR CHALLENGE
Toro Aluminum needed to find a solution regarding the interior cooling of the building to counteract the ongoing daily activity in processing and manufacturing aluminum products.
OUR SOLUTION
After running an energy audit on the building, the installation of three strategically placed HVLS fans provided the cooling performance Toro was looking to achieve.
Additionally, the HVLS fans provided a heat savings by recirculating hot rising air during winter months to lower energy bills. This positive yearly performance is now being carried over into additional facilities to further reduce overall operating costs.