A Customer Success Story from Northern Dock Systems

During

New door openings

After

New loading dock positions

Project Overview

The warehouse in Ottawa required two new loading dock positions to accommodate its busy operations.

Northern Dock Systems collaborated with the Ottawa warehouse to supply and install all the necessary equipment for these new loading dock positions. Our Equipment Installation technicians installed the following:

This installation project enhances the functionality and efficiency of the warehouse’s loading operations to keep up with their busy environment.

1. New Door Openings and Dock Pit

2. Hydraulic Dock Levelers Installed

3. Sectional Overhead Doors Installed

4. Head Curtain Dock Seals and Trailer Restraints Installed

5. Rain Shrouds Installed

 

6. Controls and Door Signage Installed

 

 
Hydraulic Dock Leveler Replacement - Ottawa Food Manufacturing Plant
Head Curtain Dock Seals - Starline Windows